Ready to start fresh

100 1782


At this point I have all of the walls patched and painted, the baseboard has been repaired from the previous layout installation and I have the base coat for the sky on the walls.  

In the lower picture, the second lighter color of blue has been introduced to the sky backdrop in preparation for airbrushing the clouds. 

The remaining trains on the shelves and the walls have been covered in blue plastic to protect them.

© Sleepy Hollow Railway Studios 2013