First operating session on the new Sleepy Hollow

The layout is finally far enough along, I can host an operating session. 

It's an eventful session since it ended in a minor train wreck. The post session analysis revealed it to be operator error.

A switch was left thrown in a crossover position to the outside track, which led to the collision .  

All in all, it was still a successful test of the layout, and a fun session.


© Sleepy Hollow Railway Studios 2013